Source: Foreclosure
Repairs: Moderate
Repairs and Updates:
- Trash Removal & Cleaning
- New Exterior Rear Door
- Landscaping
- Installed New Carpet in Bedrooms and Lower Level
- Installed Closets in the Lower Bedroom
- New Interior Paint
- Extensive Drywall Work
- Replumbed House with Pex
- New Plumbing Fixtures
- New Light Fixtures
- Electrical Work
- New Kitchen Appliances
- New Kitchen and Bathroom Cabinets
- Added Granite Countertops in Kitchen and Upstairs Hall Bathroom
- New Vanity Tops in Lower Bathroom
- New HVAC Installed
- Pressure Washed Front Porch, Driveway, and Sidewalk
- Stained Deck
- Paint Match and Repair to Exterior Paint
Total Time To Flip: 4 Months
Style of House: Bi-Level
House Flip Before and After Photos