Flip 16 – Previously Flipped Bi-Level

Flip 16 Front View

Source:  Foreclosure

Repairs:  Moderate

Repairs and Updates:

  • Trash Removal & Cleaning
  • New Exterior Rear Door
  • Landscaping
  • Installed New Carpet in Bedrooms and Lower Level
  • Installed Closets in the Lower Bedroom
  • New Interior Paint
  • Extensive Drywall Work
  • Replumbed House with Pex
  • New Plumbing Fixtures
  • New Light Fixtures
  • Electrical Work
  • New Kitchen Appliances
  • New Kitchen and Bathroom Cabinets
  • Added Granite Countertops in Kitchen and Upstairs Hall Bathroom
  • New Vanity Tops in Lower Bathroom
  • New HVAC Installed
  • Pressure Washed Front Porch, Driveway, and Sidewalk
  • Stained Deck
  • Paint Match and Repair to Exterior Paint

Total Time To Flip:  4 Months

Style of House:  Bi-Level

House Flip Before and After Photos

Front View Before
Front View Before
Flip 16 Front View
Front View After
Landscaping Before
Landscaping Before
Landscaping After
Landscaping After
Rear View Before
Rear View Before
Rear View After
Rear View After
Living Room Before
Living Room Before
Living Room After
Living Room After
Dining Room Before
Dining Room Before
Dining Room After
Dining Room After
Kitchen Before
Kitchen Before
Eat In Kitchen Before
Eat In Kitchen Before
Kitchen Renovation
Kitchen Renovation
Kitchen Rewnovation View 2
Kitchen Renovation View 2
Kitchen After
Kitchen After
Kitchen View After View 2
Kitchen After View 2
Master Bedroom Before
Master Bedroom Before
Master Bedroom After
Master Bedroom After
Hall Bathroom Before
Hall Bathroom Before
Hall Bathroom Renovation
Hall Bathroom Renovation
Hall Bathroom Renovatoin
Hall Bathroom Renovation
Hall Bathroom After
Hall Bathroom After
Lower Family Room Before
Lower Family Room Before
Lower Family Room After
Lower Family Room After
Lower Bedroom Before
Lower Bedroom Before
Lower Bedroom After
Lower Bedroom After