Flip 10 – Bi-Level that Needed a Face Lift

House Flip 10

Source:  Foreclosure

Rehab:  Extensive

Repairs and Updates:

  • New Roof
  • Interior and Exterior Paint
  • New Windows and Doors Installed Throughout
  • New Flooring Installed Throughout
  • New Exterior and Interior Lighting
  • New HVAC
  • New Water Heater
  • Plumbing
  • Electrical
  • New Kitchen: including cabinets, counter tops, appliances, and plumbing fixtures
  • Complete Bathroom Remodel
  • Drywall Work
  • Exterior Shed Repair
  • Fence Repair and Demolition
  • Deck Repair and Re-staining

Total Time to Flip:  4 Months

House Style:  Bi-Level

House Flip Before and After Photos:

House Pre Flip
House Pre Flip
House Post Flip
House Post Flip
Exterior Rear Before
Exterior Rear Before
Exterior Rear After
Exterior Rear After
Entry Before
Entry Before
Entry After
Entry After
Living Room Before
Living Room Before
Living Room After
Living Room After

Kitchen Remodel:

Kitchen Before
Kitchen Before
Kitchen Demo
Kitchen Demo
Painting Kitchen
Painting Kitchen
Installing Kitchen Cabinets
Installing Kitchen Cabinets
Kitchen After
Kitchen After

 

Dining Room Before
Dining Room Before
Dining Room After
Dining Room After
Master Bedroom Before
Master Bedroom Before
Master Bedroom After
Master Bedroom After

Bathroom Remodel:

Bathroom Before
Bathroom Before
Bathroom Demo and Plumbing
Bathroom Demo and Plumbing
Bathroom Renovations
Bathroom Renovations
Bathroom Drywall
Bathroom Drywall
Bathroom After
Bathroom After

Additional Before and After House Flip Photos: